USS Enterprise (CVN-80)

Artist's impression of the future CVN-80
History
United States
NameEnterprise
NamesakeUSS Enterprise (CVN-65)
Awarded23 May 2016
BuilderHuntington Ingalls Industries
Laid down
  • 5 April 2022[3][4]
  • 27 August 2022 (official)[5]
LaunchedNovember 2025 (planned)[1]
Sponsored byKatie Ledecky and Simone Biles
Commissioned2029 (planned)[2]
IdentificationCVN-80
StatusUnder construction[6]
General characteristics
Class and typeGerald R. Ford-class aircraft carrier
DisplacementAbout 100,000 long tons (100,000 tonnes) (full load)[7]
Length1,106 ft (337 m)
Beam134 ft (41 m)
Draft39 ft (12 m)
Installed powerTwo A1B nuclear reactors
PropulsionFour shafts
SpeedIn excess of 30 knots (56 km/h; 35 mph)
RangeUnlimited distance; 20–25 years
Complement4,660
Armament
Aircraft carriedMore than 80, approx. up to 90 combat aircraft
Aviation facilities1,092 ft × 256 ft (333 m × 78 m) flight deck

USS Enterprise (CVN-80) will be the third Gerald R. Ford-class aircraft carrier to be built for the United States Navy.[8][9] She will be the ninth United States naval vessel and third aircraft carrier to bear the name, and is scheduled to be in operation by 2028. Her construction began in August 2017 with a steel-cutting ceremony.[10]

  1. ^ Malone, Capt. Phillip (May 6, 2019). "Sea Air Space Exposition: John F. Kennedy (CVN 79) Enterprise (CVN 80) & Unnamed (CVN 81) – Two Ship Buy" (PDF). navsea.navy.mil. Naval Sea Systems Command. Archived (PDF) from the original on May 20, 2023. Retrieved October 1, 2021.
  2. ^ Shelbourne, Mallory (15 March 2024). "Aircraft Carrier Enterprise Delivery Delayed by 18 Months, Says Navy". usni.org. U.S. Naval Institute.
  3. ^ LaGrone, Sam (5 April 2022). "HII Lays Keel of Future Aircraft Carrier USS Enterprise". U.S. Naval Institute. Archived from the original on 6 April 2022. Retrieved 5 April 2022.
  4. ^ https://www.youtube.com/watch?v=u5dPu6G8OfE
  5. ^ "HII Ceremoniously Lays Keel Of Enterprise (CVN 80) Aircraft Carrier". Huntington Ingalls Industries. 27 August 2022. Archived from the original on 7 October 2022.
  6. ^ Mitchell, Becca (10 April 2018). "Newport News Shipbuilding says inactivation of former USS Enterprise is complete". WTKR. Archived from the original on 2 August 2023. Retrieved 19 September 2018.
  7. ^ "Aircraft Carriers - CVN". Fact File. United States Navy. 17 September 2020. Retrieved 18 November 2020.
  8. ^ "Navy To Name Next Ford Class Carrier Enterprise". 26 July 2012. Archived from the original on 3 December 2012. Retrieved 1 December 2012.
  9. ^ "News Release - Navy's Next Ford-Class Aircraft Carrier to be Named Enterprise". U.S. Navy. 1 December 2012. Archived from the original on 13 December 2012. Retrieved 1 December 2012.
  10. ^ "HII gets additional $228m for Enterprise (CVN 80) long lead time materials". Naval Today. 28 December 2018. Archived from the original on 28 December 2018. Retrieved 26 March 2019.